75IjsuHgtYsFdXTy93C6.avif

Circa 1995, letter from SPT to Parkway Construction for the renovation of the [[Fullerton, CA (1134 S Harbor Blvd)]] location.

Circa 1995, letter from SPT to Parkway Construction for the renovation of the [[Fullerton, CA (1134 S Harbor Blvd)]] location.

Tagged Articles

Phase 1 (1994)
Mar. 1994 - 1997