The Concept Unification Installation Manual is a manual sent alongside the Concept Unification package in 1991 as the main guide for the stage replacement process.
The manual lists info such as part lists shipped to the store, the Concept Unification schedule for the week, numbers to call incase of needed parts, proper destruction procedure of the Rock-afire Explosion stage characters, a detailed guide on the Concept Unification process including detailed diagrams and art, a set of written documents proving the safety of the flame-proof items, and a description of the showtapes included with the package and their purpose.
Table of Contents
ii - Preface
01 - Damage/Inspection List/Vendor Contacts and Telephone Numbers
08 - Daily Schedule
10 - Tools Needed for Installation
11 - Destruction Procedures
13 - Installation Procedures
13 - Diagram A (Pasqually/Stage Left)
26 - Diagram B (Munch Band/Center Stage)
37 - Diagram C (Chuck E. Cheese/Stage Right)
45 - Lighting Diagram
48 - Flameproofing
58 - UL Listing
64 - Warranties
72 - Index
Page One
Edit this page's content and metadata below. Changes create a pull request for review before going live.
⚠️ No GitHub token set. Open ⚙ Settings (bottom right) and paste your GitHub Personal Access Token to enable editing.
Numbered in the order they appear. Reference in article text with .
Fields here update the page's metadata. All saves go through a pull request for review.
Location-specific fields: store info, coordinates, animatronics, remodels, stages, etc.