CU Beta 16M: Difference between revisions

From Cheese-E-Pedia
Content added Content deleted
imported>Documentor
(Created page with "thumb|408x229.5px|The first CU Beta in September 2022 The '''CU Beta 16m''' is a stage format found at two Chuck E. Cheese's locations in the state of Illinois in the United States that converted their 3-Stages in 2020. The stage is a Studio C Beta, 16m but on a 3-Stage platform. It is the most recent CEC animatronic stage to come out, despite it not being an official stage type. ==History== The '''CU Beta 16m''' was created to replace Dar...")
(added that darien will be remodeling)
Line 1: Line 1:
[[File:Darien.jpg|thumb|408x229.5px|The first CU Beta in September 2022]]
[[File:Darien.jpg|thumb|396x396px|The first CU Beta in September 2022]]


The '''CU Beta 16m''' is a stage format found at two [[Chuck E. Cheese's]] locations in the state of Illinois in the United States that converted their 3-Stages in 2020. The stage is a [[Studio C Beta]], 16m but on a 3-Stage platform. It is the most recent CEC animatronic stage to come out, despite it not being an official stage type.
The '''CU Beta 16m''' is a stage format found at two [[Chuck E. Cheese's]] locations in the state of Illinois in the United States that converted their 3-Stages in 2020. The stage is a [[Studio C Beta]], 16m but on a 3-Stage platform. It is the most recent CEC animatronic stage to come out, despite it not being an official stage type.


==History==
== History ==
The '''CU Beta 16m''' was created to replace [[Darien, IL (7409 Cass Ave)]]’s 3-Stage due to maintenance costs. The decision was to replace the 3-Stage with parts of the Studio C Beta from the recently removed show from [[Joliet, IL (3250 Chicagoland Circle)]]. Installation begun on July 1, 2020. With everything on center stage being removed (with the exception of the fiberoptic fireworks) and thrown out to be destroyed along with the neon sign on stage right being removed. During this time Stage left and right were still running with the Beta TV light fixtures hidden behind the TV on stage right.
The '''CU Beta 16m''' was created to replace [[Darien, IL (7409 Cass Ave)]]’s 3-Stage due to maintenance costs. The decision was to replace the 3-Stage with parts of the Studio C Beta from the recently removed show from [[Joliet, IL (3250 Chicagoland Circle)]]. Installation begun on July 1, 2020. With everything on center stage being removed (with the exception of the fiberoptic fireworks) and thrown out to be destroyed along with the neon sign on stage right being removed. During this time Stage left and right were still running with the Beta TV light fixtures hidden behind the TV on stage right.


On July 2nd the bot, Swirl fixture, and the two TV light fixtures were installed although not functional yet. On July 6th the stage was finally in a state where it could run. In its first few tests all the lighting worked with the center stage floods and fiberoptic fireworks being reused. By mid July, the stage was fully complete with curtains being installed over stage left and right coming from [[West Des Moines, IA (1431 22nd St)]]. Behind the curtains starting on stage right was the CRT and rain curtains and on stage left was the Pasqually's Amateur Hour wall, flood light covers and the platform for Pasqually. Everything on Pasquallys stage was eventually removed sometime in 2021 with the exception of the flood light covers.
On July 2nd the bot, Swirl fixture, and the two TV light fixtures were installed although not functional yet. On July 6th the stage was finally in a state where it could run. In its first few tests all the lighting worked with the center stage floods and fiberoptic fireworks being reused. By mid July, the stage was fully complete with curtains being installed over stage left and right coming from [[West Des Moines, IA (1431 22nd St)]]. Behind the curtains starting on stage right was the CRT and rain curtains and on stage left was the Pasqually's Amateur Hour wall, flood light covers and the platform for Pasqually. Everything on Pasquallys stage was eventually removed sometime in 2021 with the exception of the flood light covers.


In early November 2020 the [[Chicago, IL (5030 S Kedzie Ave)]] location replaced their 3-Stage with the '''CU Beta 16m''' this time coming from [[Lafayette, IN (100 S Creasy Lane)]]. They reused the buildings and planters (with one breaking) from the 3-Stage and putting the Swirl Beta fixture in the middle with the bot in front. Stage left and right had everything removed with the walls painted black.
In early November 2020 the [[Chicago, IL (5030 S Kedzie Ave)]] location replaced their 3-Stage with the '''CU Beta 16m''' this time coming from [[Lafayette, IN (100 S Creasy Lane)]]. They reused the buildings and planters (with one breaking) from the 3-Stage and putting the Swirl Beta fixture in the middle with the bot in front. Stage left and right had everything removed with the walls painted black.


In June / July 2021 Kedzie repainted the side stages purple and installed the Light up posters from [[Matteson, IL (106 Town Center Rd)]] Circle of Lights. The light up posters have a color loop and are not programmed with the show. Also around this time Kedzie also got the TV Light fixtures from [[Avon, IN (9931 E US Hwy 36)]] and had them in the back of the show room eventually installing next to the Beta swirl between August - October 2021.
In June / July 2021 Kedzie repainted the side stages purple and installed the Light up posters from [[Matteson, IL (106 Town Center Rd)]] Circle of Lights. The light up posters have a color loop and are not programmed with the show. Also around this time Kedzie also got the TV Light fixtures from [[Avon, IN (9931 E US Hwy 36)]] and had them in the back of the show room eventually installing next to the Beta swirl between August - October 2021.


In December 2022, a bid appeared for the remodel of the Darien location on Parkway's website, with the bid being due in January 2023. A video posted on December 25th stated they would start the remodel in March 2023. As of December 28, the bid is no longer shown on the Parkway website.
==Design==
The design for both CU Beta 16m stages are different for [[Darien, IL (7409 Cass Ave)]] and [[Chicago, IL (5030 S Kedzie Ave)]] but the consistent design is re-using the 3-Stages from the [[Concept Unification Stage]] Stage Left and Right would be completely emptied of all branding of the former stage with it then either being blocked off by curtains or having random things installed to fill the space. Center stage would have the 16m bot installed in the center with the Beta Spiral installed behind the animatronic. To the left and right of Beta Swirl would be the Beta TV Light fixtures. Some stores kept the three stage buildings and planters from the [[Concept Unification Stage]] or had them completely removed leaving only the beta themed props. The spot light would be reusing the guitar spot light with the ceiling floods being the same ones from the center stage.


== Design ==
<gallery><
The design for both CU Beta 16m stages are different for [[Darien, IL (7409 Cass Ave)]] and [[Chicago, IL (5030 S Kedzie Ave)]] but the consistent design is re-using the 3-Stages from the [[Concept Unification Stage]] Stage Left and Right would be completely emptied of all branding of the former stage with it then either being blocked off by curtains or having random things installed to fill the space. Center stage would have the 16m bot installed in the center with the Beta Spiral installed behind the animatronic. To the left and right of Beta Swirl would be the Beta TV Light fixtures. Some stores kept the three stage buildings and planters from the [[Concept Unification Stage]] or had them completely removed leaving only the beta themed props. The spot light would be reusing the guitar spot light with the ceiling floods being the same ones from the center stage.
File:Darien.jpg|Finalized look of Darien

File:Kedzie1.jpg|Original look of Kedzie
== Design Gallery ==
File:Kedzie2.png|Finalized look of Kedzie
<gallery>
Darien.jpg|Finalized look of Darien
Kedzie1.jpg|Original look of Kedzie
Kedzie2.png|Finalized look of Kedzie
</gallery>
</gallery>


Line 32: Line 35:
|7409 S Cass Ave
|7409 S Cass Ave
|July 2020
|July 2020
|Stage came from Joliet, IL, which got 2.0 in 2020. Currently wearing Rockstar shirt and Avenger shorts. Curtains covering side stages are from the [[West Des Moines, IA (1431 22nd St)|West Des Moines, Iowa]] location.
|Stage came from Joliet, IL, which got 2.0 in 2020. Currently wearing Rockstar shirt and Avenger shorts. Curtains covering side stages are from the [[West Des Moines, IA (1431 22nd St)|West Des Moines, Iowa]] location.
|-
|-
|Chicago, Illinois, United States
|Chicago, Illinois, United States

Revision as of 17:46, 28 December 2022

The first CU Beta in September 2022

The CU Beta 16m is a stage format found at two Chuck E. Cheese's locations in the state of Illinois in the United States that converted their 3-Stages in 2020. The stage is a Studio C Beta, 16m but on a 3-Stage platform. It is the most recent CEC animatronic stage to come out, despite it not being an official stage type.

History

The CU Beta 16m was created to replace Darien, IL (7409 Cass Ave)’s 3-Stage due to maintenance costs. The decision was to replace the 3-Stage with parts of the Studio C Beta from the recently removed show from Joliet, IL (3250 Chicagoland Circle). Installation begun on July 1, 2020. With everything on center stage being removed (with the exception of the fiberoptic fireworks) and thrown out to be destroyed along with the neon sign on stage right being removed. During this time Stage left and right were still running with the Beta TV light fixtures hidden behind the TV on stage right.

On July 2nd the bot, Swirl fixture, and the two TV light fixtures were installed although not functional yet. On July 6th the stage was finally in a state where it could run. In its first few tests all the lighting worked with the center stage floods and fiberoptic fireworks being reused. By mid July, the stage was fully complete with curtains being installed over stage left and right coming from West Des Moines, IA (1431 22nd St). Behind the curtains starting on stage right was the CRT and rain curtains and on stage left was the Pasqually's Amateur Hour wall, flood light covers and the platform for Pasqually. Everything on Pasquallys stage was eventually removed sometime in 2021 with the exception of the flood light covers.

In early November 2020 the Chicago, IL (5030 S Kedzie Ave) location replaced their 3-Stage with the CU Beta 16m this time coming from Lafayette, IN (100 S Creasy Lane). They reused the buildings and planters (with one breaking) from the 3-Stage and putting the Swirl Beta fixture in the middle with the bot in front. Stage left and right had everything removed with the walls painted black.

In June / July 2021 Kedzie repainted the side stages purple and installed the Light up posters from Matteson, IL (106 Town Center Rd) Circle of Lights. The light up posters have a color loop and are not programmed with the show. Also around this time Kedzie also got the TV Light fixtures from Avon, IN (9931 E US Hwy 36) and had them in the back of the show room eventually installing next to the Beta swirl between August - October 2021.

In December 2022, a bid appeared for the remodel of the Darien location on Parkway's website, with the bid being due in January 2023. A video posted on December 25th stated they would start the remodel in March 2023. As of December 28, the bid is no longer shown on the Parkway website.

Design

The design for both CU Beta 16m stages are different for Darien, IL (7409 Cass Ave) and Chicago, IL (5030 S Kedzie Ave) but the consistent design is re-using the 3-Stages from the Concept Unification Stage Stage Left and Right would be completely emptied of all branding of the former stage with it then either being blocked off by curtains or having random things installed to fill the space. Center stage would have the 16m bot installed in the center with the Beta Spiral installed behind the animatronic. To the left and right of Beta Swirl would be the Beta TV Light fixtures. Some stores kept the three stage buildings and planters from the Concept Unification Stage or had them completely removed leaving only the beta themed props. The spot light would be reusing the guitar spot light with the ceiling floods being the same ones from the center stage.

Design Gallery

Current CU Beta 16Ms

Location Address Installed Condition / Notes
Darien, Illinois, United States 7409 S Cass Ave July 2020 Stage came from Joliet, IL, which got 2.0 in 2020. Currently wearing Rockstar shirt and Avenger shorts. Curtains covering side stages are from the West Des Moines, Iowa location.
Chicago, Illinois, United States 5030 S Kedzie Ave November 2020 Stage came from Lafayette, Indiana, which closed in October 2020. Old 3-Stage buildings kept, COL light up posters added to side stages sometime in 2021. Beta light up mirrors added around same time.