North Bergen, NJ (8101 Tonelle Ave): Difference between revisions
No edit summary |
|||
(5 intermediate revisions by 3 users not shown) | |||
Line 1:
{{Generic|desc=Exterior before 2.0 with 1992 checkers and 2005 signage and awnings (4/15/2022) (PC: RetailRyan on Flickr)|image=52014556816 5726f526b9 4k.jpg}}
'''''8101 Tonelle Ave, Store #485''''' was a Chuck E. Cheese's Pizza that opened on December 20, 1993 with a 1-Stage, which is still open to this day.
Line 6:
== Stages ==
Originally when the store opened, they had the [[SPT 1992 Remodel Program]] which included checkers around the store and a 1-Stage show. North Bergen would receive the [[CEC 2005 Remodel]] in 2008, however their exterior still included checkers. They would have the 1-Stage for 28 years and 9 months,
{| class="wikitable"
!Stage
Line 16 ⟶ 17:
|December 1993
|October 2022
|One of
|-
|[[Chuck E. Live Stage (Dance Floor)|Dance Floor]] + Video Wall
Line 22 ⟶ 23:
|Still In Use
|2021 Model
|}
== Gallery ==
Line 57 ⟶ 32:
== Animatronics ==
{| class="wikitable"
!Animatronics
!Manufacturing Date
|
Latest revision as of 19:20, 3 July 2024
Exterior before 2.0 with 1992 checkers and 2005 signage and awnings (4/15/2022) (PC: RetailRyan on Flickr)
8101 Tonelle Ave, Store #485 was a Chuck E. Cheese's Pizza that opened on December 20, 1993 with a 1-Stage, which is still open to this day.
The location started their 2.0 Remodel in October 2022, removing the 1-Stage, along with Edison (which has already removed the stage), East Hanover (also a 1-Stage), and Wayne (Last Road Stage in New Jersey), for a Dance Floor. The Grand Reopening occurred on December 20th, 2022.
Stages
Originally when the store opened, they had the SPT 1992 Remodel Program which included checkers around the store and a 1-Stage show. North Bergen would receive the CEC 2005 Remodel in 2008, however their exterior still included checkers. They would have the 1-Stage for 28 years and 9 months, until October 2022, when they would start the 2.0 Remodel.
Stage | Installed | Removed | Notes |
---|---|---|---|
1-Stage | December 1993 | October 2022 | One of six 1-Stages installed in New Jersey |
Dance Floor + Video Wall | October 2022 | Still In Use | 2021 Model |
Gallery
-
Full Stage View (4/15/2022) (PC: RetailRyan on Flickr)
-
Video Wall nearing completion (11/14/2022) (PC: Bestgamer ever)
Animatronics
Animatronics | Manufacturing Date | Whereabouts |
---|---|---|
Chuck E. Cheese (Cyberamic) | 1993 | Unknown / Destroyed |
Helen Henny (Cyberamic) | 1993 | Unknown / Destroyed |
Mr. Munch (Cyberamic) | 1993 | Unknown / Destroyed |
Jasper T. Jowls (Cyberamic) | 1993 | Unknown / Destroyed |
Pasqually (Cyberamic) | 1993 | Unknown / Destroyed |
Wink (Cyberamic) | 1993 | Unknown / Destroyed |