CEC 2018 2.0 Remodel Program

From Cheese-E-Pedia
Revision as of 22:43, 14 September 2022 by CECBowlingGreen (talk | contribs) (Created page.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The CEC 2.0 Remodel is a remodel of Chuck E. Cheese restaurants that has been ongoing since 2017. It is the first remodel to completely get rid of the animatronics, replacing them with a Dance Floor and completely redoing everything in the restaurants.

History

TODO: History

Design

Original Design 2017-2019

TODO: Design, Etc.

Updated Design 2019-2021

TODO: Changes, Additions, Etc.

Updated Design #2 2021-Present

TODO: Changes, Additions, Etc.

Gallery

Special 2.0's

  • There are several locations that have custom murals put into the store, some of these having to do when the store remodeled, such as Brandon, Florida, who got the 2.0 remodel in March 2021 and has a mural that uses elements from the Summer of Fun promotion.
  • The San Jose, California (2445 Fontaine Rd) location, which received 2.0 in 2018 and 2019, is the largest location in the United States, they received a Circles Of Light stage instead of a Dance Floor, but installed one in Spring 2022, it is bigger than other Dance Floors, they have a third floor, but is only accesible to employees. That third floor has many one of a kind artwork from when it was a Pizza Time Theatre, and even still has carpet with PTT Chuck's head on it.