Herndon, VA (2465 Centreville Rd): Difference between revisions
Content added Content deleted
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[File:Herndon’s Exterior pre-2.0.jpg|thumb|Herndon’s Exterior in June 2023, a month before the 2.0 remodel. (PC: Google Maps)]] |
|||
'''''2465 Centreville Rd, Store #368''''' is a Chuck E. Cheese's that opened on |
'''''2465 Centreville Rd, Store #368''''' is a Chuck E. Cheese's that opened on |
||
May 19, 1992 with a [[2-Stage]], and is still open to this day with the [[CEC 2018 2.0 Remodel Program]]. |
May 19, 1992 with a [[2-Stage]], and is still open to this day with the [[CEC 2018 2.0 Remodel Program]]. |
||
Line 4: | Line 5: | ||
== History == |
== History == |
||
Herndon opened on May 19, 1992. At first, they had a [[2-Stage]]. Nothing special is known about it, and stayed up until the location received the [[CEC 2005 Remodel Program]] in 2007, replacing the [[2-Stage]] with a [[Studio C 2000]]. It would remain this way until July 2023, when the location received the [[CEC 2018 2.0 Remodel Program]], meaning the beta was removed for a [[Chuck E. Live Stage (Dance Floor)]] + [[Video Wall]]. |
Herndon opened on May 19, 1992. At first, they had a [[2-Stage]]. Nothing special is known about it, and stayed up until the location received the [[CEC 2005 Remodel Program]] in 2007, replacing the [[2-Stage]] with a [[Studio C 2000]]. It would remain this way until July 2023, when the location received the [[CEC 2018 2.0 Remodel Program]], meaning the beta was removed for a [[Chuck E. Live Stage (Dance Floor)]] + [[Video Wall]]. The store also received the one of the first Trampoline Zones in a CEC location. |
||
{| class="wikitable" |
{| class="wikitable" |
Revision as of 11:38, 23 September 2023
2465 Centreville Rd, Store #368 is a Chuck E. Cheese's that opened on May 19, 1992 with a 2-Stage, and is still open to this day with the CEC 2018 2.0 Remodel Program.
History
Herndon opened on May 19, 1992. At first, they had a 2-Stage. Nothing special is known about it, and stayed up until the location received the CEC 2005 Remodel Program in 2007, replacing the 2-Stage with a Studio C 2000. It would remain this way until July 2023, when the location received the CEC 2018 2.0 Remodel Program, meaning the beta was removed for a Chuck E. Live Stage (Dance Floor) + Video Wall. The store also received the one of the first Trampoline Zones in a CEC location.
Stage | Installed | Removed | Notes |
---|---|---|---|
2-Stage | May 1992 | 2007 | |
Studio C 2000 | 2007 | July 2023 | |
Chuck E. Live Stage (Dance Floor) + Video Wall | July 2023 | Still In Use | 2019 Model. |
Animatronics
TODO
Gallery
TODO
Videos
TODO