Catonsville, MD (5912 Baltimore National Pike): Difference between revisions
Content added Content deleted
m (Added stuff bout the robots) |
No edit summary |
||
Line 1: | Line 1: | ||
{{Stub}} |
|||
'''''Catonsville, MD (5912 Baltimore National Pike)''''' is a ''Chuck E. Cheese'' that opened on February 25, 1992 with a [[Cyberamics Road Stage|Road Stage]], and is still open to this day with the [[CEC 2018 2.0 Remodel Program|2.0 Remodel]]. |
|||
== History == |
== History == |
||
This location opened February of 1992 with a Road Stage, |
This location opened February of 1992 with a Road Stage, |
||
Line 4: | Line 7: | ||
They also most likely got a remodel during this time, and probably got a remodel in the early 2000s. |
They also most likely got a remodel during this time, and probably got a remodel in the early 2000s. |
||
By 2007 the location had already received |
By 2007, the location had already received the [[CEC 2005 Remodel Program]] and got an expansion around October 2011 that was completed by June 2012. |
||
In May 2024 they began the 2.0 |
In May 2024, they began the 2.0 Remodel in the interior and later the exterior by May 26th, 2024. |
||
== |
==Stages== |
||
{| class="wikitable" |
{| class="wikitable" |
||
Line 18: | Line 21: | ||
| | 2-Stage|| Mid 90s || May 2024 |
| | 2-Stage|| Mid 90s || May 2024 |
||
|- |
|- |
||
| | Dance Floor + Video Wall||May 2024||Still in Use |
Revision as of 18:07, 18 June 2024
This article is a stub. You can help by expanding it. |
Catonsville, MD (5912 Baltimore National Pike) is a Chuck E. Cheese that opened on February 25, 1992 with a Road Stage, and is still open to this day with the 2.0 Remodel.
History
This location opened February of 1992 with a Road Stage, In the mid 1990s they would replace the stage with a 2-Stage most likely salvaging the animatronics from the Road Stage, They also most likely got a remodel during this time, and probably got a remodel in the early 2000s.
By 2007, the location had already received the CEC 2005 Remodel Program and got an expansion around October 2011 that was completed by June 2012.
In May 2024, they began the 2.0 Remodel in the interior and later the exterior by May 26th, 2024.
Stages
Stage | Installed | Removed |
---|---|---|
Road Stage | May 1992 | Mid 90s |
2-Stage | Mid 90s | May 2024 |
Dance Floor + Video Wall | May 2024 | Still in Use |