CEC 2018 2.0 Remodel Program

From Cheese-E-Pedia
Revision as of 03:14, 31 October 2022 by ThatBoiCydalan (talk | contribs) (Added Garden Grove CA to the mural list)

The CEC 2.0 Remodel is a remodel of Chuck E. Cheese restaurants that has been ongoing since 2017. It is the first remodel to completely get rid of the animatronics, replacing them with a Dance Floor and completely redoing everything in the restaurants.

History

TODO: History

Design

Original Design 2017-2019

The original design for 2.0 introduced a brand new color scheme, having green on the outside with gray detailing, a new logo, and some circles on the side, as well as a new font for the wording that read "Chuck E. Cheese", there was also a "Pizzeria & Games" sign, making the full name "Chuck E. Cheese Pizzeria & Games". The inside had white walls with gray stripes, wood flooring near the counters, new carpet, and a brand new Dance Floor with TV's above it to replace the animatronics, and where the stage was is now where the silhouettes of Munch's Make Believe Band are, it also has a little bio about stuff they like, the bios are also on the cups too. There is not too much artwork as previous remodels, having only a few pieces, some being things like "Play" and "High Five", there is also a piece that is a sort of timeline of their history, with it starting in 1977 and going into present day, an interesting thing is that on the 1977 box, the Kooser bots are shown, except that store opened in December 1978, making it technically not correct. This design debuted at the San Antonio (Stone Oak), Texas (1403 N Loop) location in 2017.

Updated Design 2019-2021

TODO: Changes, Additions, Etc.

Updated Design #2 2021-Present

TODO: Changes, Additions, Etc.

Gallery

Special 2.0's