Catonsville, MD (5912 Baltimore National Pike): Difference between revisions

From Cheese-E-Pedia
Content added Content deleted
(I wanted to add something.)
 
No edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Stub}}{{Generic|image=Chuck-e-cheeses-catonsville-0000.jpg|desc=Exterior before May 2024}}
'''''Catonsville, MD (5912 Baltimore National Pike)''''' is a ''Chuck E. Cheese'' that opened on February 25, 1992 with a [[Cyberamics Road Stage|Road Stage]], and is still open to this day with the [[CEC 2018 2.0 Remodel Program|2.0 Remodel]].

== History ==
== History ==
This location opened February of 1992 with a Road Stage,
This location opened February of 1992 with a Road Stage,
Line 4: Line 7:
They also most likely got a remodel during this time, and probably got a remodel in the early 2000s.
They also most likely got a remodel during this time, and probably got a remodel in the early 2000s.


By 2007 the location had already received phase 4 and got an expansion around October 2011 that was completed by June 2012
By 2007, the location had already received the [[CEC 2005 Remodel Program]] and got an expansion around October 2011 that was completed by June 2012.

In May 2024, they began the 2.0 Remodel in the interior and later the exterior by May 26th, 2024.


==Stages==
In May 2024 they began the 2.0 remodel in the interior and later the exterior by May 26th
{| class="wikitable"
|-
!Stage
!Installed
!Removed
!Notes
|-
|[[Cyberamics Road Stage|Road Stage]]
|May 1992
|Mid 90s
|One of three installed in Maryland.
|-
|[[2-Stage]]
|Mid 90s
|May 2024
|One of five installed in Maryland.
|-
|[[Chuck E. Live Stage (Dance Floor)|Dance Floor]] + [[Video Wall]]
|May 2024
|Still in Use
|2021 Model
|}

Latest revision as of 18:20, 18 June 2024

Exterior before May 2024


Catonsville, MD (5912 Baltimore National Pike) is a Chuck E. Cheese that opened on February 25, 1992 with a Road Stage, and is still open to this day with the 2.0 Remodel.

History

This location opened February of 1992 with a Road Stage, In the mid 1990s they would replace the stage with a 2-Stage most likely salvaging the animatronics from the Road Stage, They also most likely got a remodel during this time, and probably got a remodel in the early 2000s.

By 2007, the location had already received the CEC 2005 Remodel Program and got an expansion around October 2011 that was completed by June 2012.

In May 2024, they began the 2.0 Remodel in the interior and later the exterior by May 26th, 2024.

Stages

Stage Installed Removed Notes
Road Stage May 1992 Mid 90s One of three installed in Maryland.
2-Stage Mid 90s May 2024 One of five installed in Maryland.
Dance Floor + Video Wall May 2024 Still in Use 2021 Model